| This pic is included as a reference for the parts being manufactured. |
|
| Part 6 was made from two (2) pieces of Celtec that were shaped on a disc/belt sander. After that, a hole was drilled in one piece to accommodate a length of brass tubing, and then all of the pieces were glued together with CA glue. |
|
|
Part 7 was made from a piece of brass rod. The flag was obtained from the Internet and printed on a sheet of address labels. Before installation, the flag will be laminated to make it waterproof. |
| Part 8 was made from two (2) lengths of brass tubing and a piece of neoprene hose. These were glued together with CA glue. |
|
|
Part 9 Not yet complete. |
|
Part 10 Not yet complete.
Next Step - Part 2 - Installing the sail hardware |
|
If you have any suggestions or comments about this site or construction, please send me an email by clicking here!
Copyright © 2003 - 2008 John T. VanderHeiden
Last Updated Sunday, May 04, 2003 8:48:16 PM