| Part 1 | Bilge pumps and check valves. |
| Part 1b | Automatic Depth Control (ADC-1), Automatic Leveling Control (APC-3), Missing Pulse Failsafe (AFS). |
| Part 1c | Batteries and Battery Eliminator/Voltage Regulator (BE/VR). |
| Part 2 | Bilge pump and check valve installation. |
| Part 2b | Automatic Depth Control (ADC-1) installation. |
| Part 2c | Automatic Leveling Control (APC-3) installation. |
| Part 2d | Missing Pulse Failsafe (AFS) installation. |
| Part 2e | Batteries and Battery Eliminator/Voltage Regulator (BE/VR) installation. |
| Part 2f | Removal of Battery Eliminator/Voltage Regulator(BE/VR). |
If you have any suggestions or comments about this site or construction, please send me an email by clicking here!
Copyright © 2003 - 2008 John T. VanderHeiden
Last Updated Friday, April 11, 2003 4:27:50 PM