|
I´m manufacturing the Aft Main Deck from Celtec: 8mm (deck), 4mm (bulkhead support) and 2mm (port/starboard rub rail supports). The gray pieces seen here will combine to make the 8mm Aft Main Deck. |
| As with the Forward Main Deck, the Aft Main Deck will be removable. In this photograph, notice the blue masking tape. The long strips are glue lines and the smaller pieces are break lines. The Aft Main Deck will actually be two (2) separate and removable pieces. |
|
|
Here, I´m beginning to install the 2mm Celtec for the port rub rail support. |
| A little glue here, a little tape there ... |
|
|
... working my way ... |
| ... around the stern ... |
|
|
... and then finally to the other side. |
| To finish up, I started at the bow and connected the rub rail at the stern. |
|
If you have any suggestions or comments about this site or construction, please send me an email by clicking here!
Copyright © 2003 - 2008 John T. VanderHeiden
Last Updated Sunday, January 25, 2004 2:17:52 AM