After making four bulkheads, it was time to begin cutting out the Fuel Fill & Vents locker (starboard), the Engine Room Escape locker (port), the entry for the Boat Deck Up/Down Stairway (aft & upper deck) and the opening for the manually operated Roll Up Door (aft).
Next, I needed some support pieces for the deck and also a floor support for the Engine Room Escape Locker.


Gluing everything together was pretty straight forward, but it was also time consuming. I took my time making sure the structure was level and square.
Here, you can see I´ve added the center piece for the deck. It is currently removable as I´m unsure, at this point, if access below will be needed.

I still have to fabricate the remaining port/starboard, angled bulkheads and glue them in place. I´ll do that next along with boxing in the Engine Room Escape locker (port), the entry for the Boat Deck Up/Down Stairway (aft & upper deck) and the Fuel Fill & Vents locker (starboard).




Part 3 - Bulkheads and lockers

Return to Boat Deck Structure

If you have any suggestions or comments about this site or construction, please send me an email by clicking here!

Copyright © 2003 - 2008 John T. VanderHeiden
Last Updated Friday, November 14, 2003 5:52:16 AM